Net Metering Philippines 2026: Everything You Need to Know

Net metering allows solar homeowners to export excess electricity to the grid and receive a credit on their bill. Under RA 9513 (Renewable Energy Act), Meralco and all distribution utilities must accommodate net metering for systems under 100 kW.

In April 2026, the Department of Energy issued DC2026-01-00012, which significantly cut processing times. LGUs must now issue electrical permits within 3 working days and Certificates of Final Electrical Inspection (CFEI) within 7 working days. Meralco must approve or reject complete net metering applications within 10 working days.

The fees are fixed: the DIMC fee (smart meter swap) is capped at ₱3,000 for residential properties. The ERC Certificate of Compliance fee is a flat ₱1,500 paid via LBP Link.BizPortal. Electronic signatures are now fully accepted — notarization is no longer required.

One critical detail most solar companies don’t tell you: Meralco credits roll month-to-month but any unused credit balance is permanently reset to zero at the end of the calendar year. This is why right-sizing your system matters. An oversized system generates credits you’ll never use — and lose.

Curious what this means for your bill?

Run your numbers through the calculator — takes about a minute.

Try the calculator
Keep reading

More guides

Getting Started · 4 min

How to Read Your Meralco Bill for Solar Sizing

Read guide →
System Types · 5 min

Grid-Tied vs Hybrid: Which System Is Right for You?

Read guide →
Financials · 5 min

How Long Does Solar Take to Pay Back in Calabarzon?

Read guide →